2025 Chicago Regional Bridge Building Specifications
These rules have been developed by the Chicago Regional Bridge Building
Committee for the Forty-Ninth Chicago Regional Bridge Building
Contest to be held on
Tuesday, January 28, 2025,
at Illinois Institute of
Technology, Chicago IL 60616, USA. If you have a question about these
rules, FIRST take a look at the list of Frequently Asked Questions (FAQ) to see
if the answer is already there. If you have read the FAQ, and still have
a question about the contest rules, then you may contact the Chief
Judge, Jamal Grainawi at
Jamal.grainawi@wsp.com.
For questions on any contest topic EXCEPT the rules please contact
Prof. Carlo Segre at
segre@iit.edu.
The object of this contest is to see who can design, construct and test
the most efficient bridge within the specifications. Model bridges
are intended to be simplified versions of real-world bridges, which are
designed to permit a load to travel across the entire bridge. In order to
simplify the model bridge design process, the number of loading positions
is reduced, and to allow the contest to proceed in a reasonable amount of
time, only one loading position is actually tested. These simplifications
do not negate the requirement that the bridge must be designed to accept a
load at any of the positions. Bridges determined by the judges to not
meet this requirement will be disqualified and tested as unofficial
bridges.
1. Materials
-
The bridge must be constructed only from 3/32 inch square
cross-section basswood and any commonly available adhesive.
Kits of basswood are available from the the IIT Office of Admissions,
contact Margarita Fraga,
fragam@iit.edu, for information.
-
The basswood may be notched, cut, sanded or laminated in any manner
but must still be identifiable as basswood.
-
No other materials may be used. The bridge may not be stained,
painted or coated in any fashion with any foreign substance.
2. Construction
-
The bridge mass shall be no greater than 25.00 grams.
-
The bridge (see Figure 1) must span a gap (S) of 300. mm,
be no longer (L) than 400. mm,
be no wider (W) than 80. mm, and
be no taller (H) than
100. mm above the support surfaces. The bridge structure
must extend below the support surfaces by no more
(B) than 10. mm.
-
The bridge shall contain an "arch-type" structure which starts below
the main support plane (see Figure 1) and spans between the supports. An
arch uses curved members for its main load carrying members. For
this contest, the arch shall be composed of either curved members
or two or more straight segments arranged to approximate an A-frame
or a multi-segmented frame. The arch element must make contact with
the vertical faces of both support surfaces and must extend
10. mm or more above the support surfaces in the center of the
span. Tie beams or tension members connecting the arch ends along
the span are not allowed below the support surfaces.
-
The loading plane shall be horizontal and shall lie a distance
(P) between 10. mm and
100. mm above the support surfaces.
-
The bridge must be constructed to provide for the loading plate
(see section 3 below) at each of the
two loading points 20. mm and 40. mm on either
side of the center of the 300. mm span along the longitudinal
axis of the bridge.
3. Loading
-
The load will be applied downward, from below, by means of a
40. mm square plate (see Figure 2). The plate will have a
thickness (t) of at least 6 mm but less than 13 mm
and will have an up to 9.53 mm (3/8 inch) diameter threaded
rod attached from below at its center with a standard hex nut. The
plate will be horizontal with two sides parallel to the longitudinal
axis of the bridge.
-
The load will be applied on the longitudinal axis of the bridge at one
of two loading points: 20. mm and 40. mm on either side of
the center of the 300. mm span.
-
On the day of the competition, the judges will randomly decide which
of the two loading positions will be used; it will be the same for
all bridges.
4. Testing
-
On the day of the competition, contestants will place their bridge
on the testing machine support surfaces, adjusting them by no more
than ±2. mm to ensure contact with the downward projecting
portions of the bridge and with threaded rod projecting from below at
the designated loading position.
-
The loading plate will be placed from above on the threaded rod
with two sides parallel to the longitudinal axis of the bridge and
secured with a hex nut.
-
The load will be applied from below, with the contestant rotating the
Vernier testing machine load wheel until bridge failure is sensed
(see 4d). Competition loading will stop at 50. kg.
-
Bridge failure is defined as the inability of the bridge to carry
additional load as sensed by the Vernier testing machine.
-
The bridge with the highest structural efficiency, E, will be
declared the winner. Bridges failing above 50. kg will be
considered to have held 50. kg for efficiency calculation.
E = Load supported in grams (50,000g maximum) / Mass of bridge in grams
5. Qualification
-
All construction and material requirements will be checked prior to
testing. Bridges failing to meet these requirements will be
disqualified. If physically possible, disqualified bridges may be
tested as exhibition bridges at the discretion of the builder and the
contest directors.
-
If, during testing, a condition becomes apparent (i.e., use of
ineligible materials, inability to support the loading plate, bridge
optimized for a single loading point, etc.) which is a violation of
the rules or prevents testing as described above in Section 4, that bridge shall be disqualified.
-
Decisions of the judges are final; these rules may be revised as
experience shows the need. Please check our web site,
http://bridgecontest.phys.iit.edu
after January 9, 2025, to learn whether any changes have been made.
Last update: December 11, 2024
[ Bridge Contest Home ] [ International Contest ] [ Chicago Regional Contest ]
[ Region Locator ] [ Official Documentation ] [ Other Bridge Links ]
For further information, contact: Prof. Carlo Segre -
segre@iit.edu,
Illinois Institute of Technology
© International Bridge Building Committee, 2024